3, 4 |
Annual leak detection certification not completed (Required annually). |
3, 4 |
Annual line precision and mechanical line leak detector functional test not completed. |
3, 4 |
Flex connector sacrificial anode system not tested (required every 3 years) - Test anodes and replace as needed |
3, 4 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). |
3, 4 |
Tank sacrificial anode system not tested (Required every 3 years). |
3, 4 |
Triennial spill prevention equipment testing not completed. |