Division of Petroleum & Chemical Safety

 

Facility: 2010129 Tank: 3

Click for Facility/Tank Ownership history

Capacity: 10000
Product: Gasoline - Regular
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 2/19/1992
Current Age: 34
Install Date: 2/1/1991
Last Used Date:
Product Date: 2/1/1991
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Sacrificial Anode Flex Connector STP 10/7/2025 10/7/2028
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp 1/2 8/22/2022 8/22/2025
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp 3/4 8/22/2022 8/22/2025
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank STIP3 Cathodic Protection with Dielectric Coating 10/7/2025 10/7/2028
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 10/7/2025 10/7/2026
Leak Detect - Tank Automatic Tank Gauging Arizona Instruments Encompass 10/7/2025 10/7/2026
Overfill Prev Device Overfill Drop Tube Valve 5/10/2004 8/22/2022 8/22/2025 10/7/2025
Piping Fiberglass Single Wall Piping N/A N/A
Piping Not Installed STP/Tanktop Sump N/A N/A
Leak Detect - Piping Piping Sump Sensors Not Regulated Not Required N/A N/A
Spill Contain Device Single Wall Spill Bucket 10/7/2025 10/7/2028
Tank STIP3 Single Wall N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Single Wall Piping Precision Test (Piping) Pass 10/7/2025 Show History
Piping Steel Single Wall Piping Precision Test (Piping) Pass 9/27/2021 Show History
Tank STIP3 Single Wall Precision Test (Tank) Pass 2/11/2020 Show History