Equipment Information
| Equipment Type |
Equipment |
Install Date |
Last Passing Test Date |
Test Expire Date |
Failed Test Date |
|
Corrosion Prot - Piping
|
Fiberglass Non-Corrosive
|
|
Not applicable
|
Not applicable
|
|
|
Corrosion Prot - Tank
|
Fiberglass Non-Corrosive
|
|
Not applicable
|
Not applicable
|
|
|
Leak Detect - Piping
|
Electronic Pressurized Line Leak Detection West Line
|
11/26/2025
|
11/26/2025
|
11/26/2026
|
|
|
Leak Detect - Piping
|
Electronic Pressurized Line Leak Detection east line
|
11/26/2025
|
11/26/2025
|
11/26/2026
|
|
|
Leak Detect - Tank
|
Non-Discriminating Interstitial Monitoring Sensors With Monitor
|
11/26/2025
|
11/26/2025
|
11/26/2026
|
|
|
Overfill Prev Device
|
Overfill Alarm
|
12/2/2025
|
12/2/2025
|
12/2/2028
|
|
|
Overfill Prev Device
|
Overfill Drop Tube Valve South
|
3/14/2022
|
11/24/2025
|
11/24/2028
|
|
|
Overfill Prev Device
|
Overfill Drop Tube Valve north
|
|
11/24/2025
|
11/24/2028
|
|
|
Piping
|
Flexible Double Wall A.P.T. Poly Tech P175SC
|
11/26/2025
|
Not applicable
|
Not applicable
|
|
|
Piping
|
Single Wall STP/Tanktop Sump
|
3/9/2022
|
11/12/2025
|
11/12/2028
|
|
Leak Detect - Piping
|
Sump Sensor with positive shutdown
|
11/26/2025
|
11/26/2025
|
11/26/2026
|
|
|
Spill Contain Device
|
Double Wall Spill Bucket south
|
3/9/2022
|
11/24/2025
|
11/24/2028
|
|
|
Spill Contain Device
|
Double Wall Spill Bucket North
|
|
11/24/2025
|
11/24/2028
|
|
|
Tank
|
Composite Double Wall
|
3/3/2022
|
Not applicable
|
Not applicable
|
|
Failed test = the latest test has failed.
Not applicable = a test does not apply to this equipment type or configuration.
No passing test found = a passing test is expected but was not found from the source data.