Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 5011988 Tank: 2
Click for Facility/Tank Ownership history
Capacity:
9400
Product:
Diesel Fuel
Status:
Currently in use
Regulated Status
Federal
OSFM
First Notify Date:
4/1/1986
Current Age:
42
Install Date:
6/15/1982
Last Used Date:
Product Date:
6/15/1982
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
European with No Test Req Suction
N/A
N/A
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS - 4c
6/27/2024
6/27/2025
Overfill Prev Device
Overfill Drop Tube Valve
12/13/2019
7/1/2022
7/1/2025
Piping
Fiberglass Double Wall Ameron Dualoy 3000/LCX
12/13/2019
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
12/12/2019
Leak Detect - Piping
Piping Sump Sensors Not Regulated Not Installed
N/A
N/A
Spill Contain Device
Double Wall Spill Bucket
4/24/2023
4/24/2023
4/24/2026
Tank
Fiberglass Single Wall
N/A
N/A
Vent, Riser, Fill Piping
Steel risers
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Fiberglass Double Wall Ameron Dualoy 3000/LCX
Precision Test (Piping)
Pass
12/13/2019
Show History
Piping
Steel Single Wall Piping
Precision Test (Piping)
Pass
12/13/2019
Show History
Previous Page