Division of Petroleum & Chemical Safety

 

Facility: 2044529 Tank: 2

Click for Facility/Tank Ownership history

Capacity: 8000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 12/15/2009
Current Age: 15
Install Date: 12/9/2009
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Flexible Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 11/25/2024 11/25/2024 11/25/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350R 5/30/2024 5/30/2025
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 5/30/2024 5/30/2025
Overfill Prev Device Ball Only Removed Ball Float Vent Valve 2/25/2022 N/A N/A
Overfill Prev Device Overfill Alarm 5/30/2024 5/30/2027
Overfill Prev Device Overfill Drop Tube Valve 2/25/2022 5/30/2024 5/30/2027
Piping Flexible Double Wall OPW Flexworks N/A N/A
Piping Single Wall STP/Tanktop Sump 6/28/2024 6/28/2027
Leak Detect - Piping Stand Alone Sump Sensor 8/24/2023 5/30/2024 5/30/2025
Spill Contain Device Double Wall Spill Bucket 2/25/2022 5/30/2024 5/30/2027
Tank Fiberglass Double Wall XERXES N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary08172022-094757.pdf Approved 9/13/2022

Compatibility Form Attachments

File Name Description
e85 veeder probe.pdf ATG Probe
E85 all.pdf ATG Probe
E85 Emco.pdf Double Wall Spill Bucket
e85 dope.pdf Gasoila E Seal Pipe dope
E85 all.pdf Gilbarco
E85 all.pdf Gilbarco
E85 all.pdf Leak Detect - Piping - Electronic Pressurized Line Leak Detection
E85 sensors.pdf Leak Detect - Tank - Non-Discriminating Interstitial Monitoring Sensors
E85 all.pdf Leak Detect - Tank - Non-Discriminating Interstitial Monitoring Sensors
e85 veeder sensor.pdf Overfill Alarm
e85 veeder sensor.pdf Overfill Alarm
E85 Emco.pdf Overfill Drop Tube Valve
E85 Emco.pdf Overfill Prev Device - Overfill Drop Tube Valve
E85 Emco.pdf Overfill Prev Device - Overfill Drop Tube Valve
E85 all.pdf Piping - Flexible Double Wall OPW Flexworks
E85 all.pdf Piping - Flexible Double Wall OPW Flexworks
E85 all.pdf Piping - Single Wall STP/Tanktop Sump
E85 all.pdf Piping - Single Wall STP/Tanktop Sump and UDC
E85 all.pdf Stand Alone Sump Sensor Non-Discriminating in Piping - Single Wall STP/Tanktop Sump
E85 all.pdf Tank - Fiberglass Double Wall XERXES
E85 all.pdf Tank - Fiberglass Double Wall XERXES
E85 sensors.pdf Veeder Root Sensors

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Flexible Double Wall OPW Flexworks Precision Test (Piping) Pass 5/30/2024 Show History