Division of Petroleum & Chemical Safety

 

Facility: 2010104 Tank: 4

Click for Facility/Tank Ownership history

Capacity: 12000
Product: Gasoline - Regular
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 11/11/1993
Current Age: 31
Install Date: 9/23/1993
Last Used Date:
Product Date: 9/23/1993
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Sacrificial Anode Flex Connector STP 10/26/2020 9/12/2023 9/12/2026 9/12/2023
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp 5/6 9/12/2023 9/12/2026
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp. 7/8 9/12/2023 9/12/2026
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp 1/2 9/12/2023 9/12/2026
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp 3/4 9/25/2023 9/25/2026
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Composite Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 12/20/2023 9/12/2024 9/12/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 9/12/2024 9/12/2025
Overfill Prev Device Ball Float Vent Valve 9/12/2024 9/12/2027
Piping Fiberglass Double Wall N/A N/A
Piping Single Wall STP/Tanktop Sump
Leak Detect - Piping Piping Sump Sensors Not Regulated Not Installed N/A N/A
Spill Contain Device Single Wall Spill Bucket 9/12/2024 9/12/2027
Tank Composite Single Wall N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Precision Test (Piping) Pass 9/12/2022 Show History
Tank Composite Single Wall Precision Test (Tank) Pass 6/3/2019 Show History