Division of Petroleum & Chemical Safety

 

Facility: 2021397 Tank: 6

Click for Facility/Tank Ownership history

Capacity: 20000
Product: Ultra Low Sulfur Diesel
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 12/19/2008
Current Age: 18
Install Date: 7/31/2008
Last Used Date:
Product Date: 7/31/2008
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive 7/3/2008 Not applicable Not applicable
Corrosion Prot - Tank Fiberglass Non-Corrosive 7/3/2008 Not applicable Not applicable
Leak Detect - Piping Mechanical Pressurized Line Leak Detection North 11/25/2025 11/25/2026
Leak Detect - Piping Mechanical Pressurized Line Leak Detection South 11/25/2025 11/25/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 300 7/3/2008 11/25/2025 11/25/2026
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 7/3/2008 11/25/2025 11/25/2026
Overfill Prev Device Overfill Drop Tube Valve 7/3/2008 11/30/2021 11/30/2024
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX 7/3/2008 Not applicable Not applicable
Piping Single Wall STP/Tanktop Sump North 11/30/2021 11/30/2024
Leak Detect - Piping Sump Sensor 11/25/2025 11/25/2026
Piping Single Wall STP/Tanktop Sump South 11/30/2021 11/30/2024
Leak Detect - Piping Sump Sensor 11/25/2025 11/25/2026
Spill Contain Device Single Wall Spill Bucket 7/3/2008 11/30/2021 11/30/2024
Tank Fiberglass Double Wall XERXES 7/3/2008 Not applicable Not applicable

Failed test = the latest test has failed.

Not applicable = a test does not apply to this equipment type or configuration.

No passing test found = a passing test is expected but was not found from the source data.


Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 11/25/2025 Show History