Division of Petroleum & Chemical Safety

 

Facility: 5011116 Tank: 4

Click for Facility/Tank Ownership history

Capacity: 15000
Product: Gasoline - Regular
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 12/10/2002
Current Age: 22
Install Date: 10/31/2002
Last Used Date:
Product Date: 11/1/2002
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Piping Flexible Non-Corrosive 10/3/2002 N/A N/A
Corrosion Prot - Tank Composite Non-Corrosive 10/3/2002 N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 6/25/2024 6/25/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 300c with CSLD 6/25/2024 6/25/2025
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 10/3/2002 6/25/2024 6/25/2025
Overfill Prev Device Overfill Drop Tube Valve 5/10/2019 6/23/2022 6/23/2025
Piping Fiberglass Double Wall N/A N/A
Piping Flexible Double Wall OPW Pisces 10/3/2002 N/A N/A
Piping Single Wall STP/Tanktop Sump 6/23/2022 6/23/2025
Leak Detect - Piping Sump Sensor 6/25/2024 6/25/2025
Piping Single Wall Transition Sump 6/23/2022 6/23/2025
Leak Detect - Piping Sump Sensor 6/25/2024 6/25/2025
Spill Contain Device Single Wall Spill Bucket 6/23/2022 6/23/2025
Tank Composite Double Wall Modern Welding Glasteel II 10/3/2002 N/A N/A
Vent, Riser, Fill Piping Steel risers N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Precision Test (Piping) Pass 6/25/2024 Show History
Piping Flexible Double Wall OPW Pisces Precision Test (Piping) Pass 6/25/2024 Show History