Division of Petroleum & Chemical Safety

 

Facility: 6029218 Tank: 6

Click for Facility/Tank Ownership history

Capacity: 20000
Product: Diesel Fuel
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 9/9/1998
Current Age: 27
Install Date: 6/20/1997
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Composite Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 11/14/2024 11/14/2025
Leak Detect - Tank Automatic Tank Gauging Warren Rogers Assoc. PetroNetwork S3 CITLDS Version D 11/14/2024 11/14/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 Plus 11/14/2024 11/14/2025
Overfill Prev Device Overfill Alarm 11/17/2023 11/17/2026
Overfill Prev Device Overfill Drop Tube Valve 2/5/2025 2/5/2025 2/5/2028
Piping Blending Sump 11/13/2024 11/13/2027
Leak Detect - Piping Sump Sensor with positive shutdown 11/14/2024 11/14/2025
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall STP/Tanktop Sump STP 9/26/2018 11/13/2024 11/13/2027
Leak Detect - Piping Sump Sensor with positive shutdown 11/14/2024 11/14/2025
Piping Single Wall STP/Tanktop Sump Remote Fill 11/14/2024 11/14/2027
Leak Detect - Piping Sump Sensor 11/14/2024 11/14/2025
Piping Single Wall Transition Sump 9/26/2018 11/13/2024 11/13/2027
Leak Detect - Piping Sump Sensor 11/14/2024 11/14/2025
Spill Contain Device Single Wall Spill Bucket Tank Top 9/26/2018 11/14/2024 11/14/2027
Spill Contain Device Single Wall Spill Bucket Remote Fill 7/31/2019 11/14/2024 11/14/2027
Tank Composite Single Wall ACT 100 N/A N/A
Vent, Riser, Fill Piping Steel risers N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 12/29/2024 Show History
Piping Flexible Double Wall Precision Test (Piping) Pass 8/8/2022 Show History
Tank Composite Single Wall Precision Test (Tank) Pass 9/18/2023 Show History