Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 4027656 Tank: 4
Click for Facility/Tank Ownership history
Capacity:
20000
Product:
Diesel Fuel
Status:
Currently in use
Regulated Status
Federal
OSFM
First Notify Date:
7/15/1991
Current Age:
34
Install Date:
2/1/1991
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Sacrificial Anode Flex Connector STP
7/25/2022
7/25/2025
Corrosion Prot - Piping
Fiberglass Non-Corrosive
4/9/2002
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Siphon Bar
N/A
N/A
Leak Detect - Tank
Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor
3/13/2025
3/13/2026
Overfill Prev Device
Overfill Drop Tube Valve
3/24/2025
3/24/2025
3/24/2028
Piping
Fiberglass Double Wall Ameron Dualoy 3000/LCX
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
6/9/2022
6/9/2025
Leak Detect - Piping
Sump Sensor
3/13/2025
3/13/2026
Spill Contain Device
Double Wall Spill Bucket
2/15/2024
3/13/2025
3/13/2028
Tank
Fiberglass Double Wall Owens Corning Brine Filled
N/A
N/A
Vent, Riser, Fill Piping
Steel risers
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Fiberglass Double Wall Ameron Dualoy 3000/LCX
Precision Test (Piping)
Pass
3/20/2024
Show History
Previous Page