Division of Petroleum & Chemical Safety

 

Facility: 2047745 Tank: 4

Click for Facility/Tank Ownership history

Capacity: 6000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 8/30/2024
Current Age: 1
Install Date: 5/16/2024
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number F44205200

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 9/18/2024 5/14/2025 5/14/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus 9/18/2024 5/14/2025 5/14/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 9/18/2024 5/14/2025 5/14/2026
Overfill Prev Device Overfill Alarm 9/18/2024 9/18/2024 9/18/2027
Overfill Prev Device Overfill Drop Tube Valve 9/18/2024 9/18/2024 9/18/2027
Piping Fiberglass Double Wall NOV Fiberglass Systems Red Thread IIA fiberglass piping 9/18/2024 N/A N/A
Piping Single Wall STP/Tanktop Sump 9/18/2024 9/18/2024 9/18/2027
Leak Detect - Piping Sump Sensor with positive shutdown 9/18/2024 5/14/2025 5/14/2026
Spill Contain Device Double Wall Spill Bucket 9/18/2024 9/18/2024 9/18/2027
Tank Fiberglass Brine Filled Double Wall XERXES 5/16/2024 N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary04232024-104211.pdf Approved 4/23/2024

Compatibility Form Attachments

File Name Description
e85 probe.pdf ATG Probe
e85 -jomar.pdf Ball Valves
e85 franklin spill.pdf Double Wall Spill Bucket
e85 plld.pdf Electronic Pressurized Line Leak Detection
e85 xerxes.pdf Fiberglass Brine Filled Double Wall
e85 frp pipe.pdf Fiberglass Double Wall fiberglass piping
e85 -hosemaster.pdf Flex Connector Steel
e85 dope.pdf Gasoila E Seal
e85 gilbarco.pdf Gilbarco
e85 contental hose.pdf Hose
E85 sensors.pdf Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor
e85 opw.pdf Nozzle
e85 franklin stp.pdf Other Pump
E85 equipment approvals US Department of Energy.pdf Other Riser
e85 drop tube.pdf Overfill Drop Tube Valve
e85 shear valve.pdf Shear Valves
E85 equipment approvals US Department of Energy.pdf Single Wall STP/Tanktop Sump
e85 franklin all.pdf Submersible Turbine Pump
E85 sensors.pdf Sump Sensor with positive shutdown
e85 bravo.pdf UDC

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall NOV Fiberglass Systems Red Thread IIA fiberglass piping Precision Test (Piping) Pass 9/18/2024 Show History
Tank Fiberglass Brine Filled Double Wall XERXES Precision Test (Tank) Pass 9/18/2024 Show History