Division of Petroleum & Chemical Safety

 

Facility: 2023271 Tank: 62

Click for Facility/Tank Ownership history

Capacity: 10000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 6/1/1994
Current Age: 31
Install Date: 11/15/1993
Last Used Date:
Product Date: 12/20/1993
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive 9/12/2003 N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 3/4/2025 3/4/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 3/4/2025 3/4/2026
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 3/4/2025 3/4/2026
Overfill Prev Device Overfill Alarm 11/7/2024 11/7/2027
Overfill Prev Device Overfill Drop Tube Valve 11/7/2024 11/7/2027
Piping Fiberglass Double Wall N/A N/A
Piping Single Wall STP/Tanktop Sump 11/7/2024 11/7/2027
Leak Detect - Piping Sump Sensor with positive shutdown 3/4/2025 3/4/2026
Spill Contain Device Double Wall Spill Bucket 11/7/2024 11/7/2027
Tank Fiberglass Double Wall Owens Corning N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary05272025-093239.pdf Approved 5/28/2025

Compatibility Form Attachments

File Name Description
Veeder Root Probe & Float.pdf ATG Probe
Veeder Root Probe & Float.pdf ATG Probe
Bennett 3K series E-85 Compatability info.pdf Bennett Dispenser
Bennett 3K series E-85 Compatability info.pdf Bennett Dispenser
OPW Compatibility Matrix.pdf Double Wall Spill Bucket
OPW Compatibility Matrix.pdf Double Wall Spill Bucket
Smith Piping.pdf Fiberglass Double Wall
Smith Piping.pdf Fiberglass Double Wall
OC Tank E-85 compatability for tank build after 1990.pdf Fiberglass Double Wall
OC Tank E-85 compatability for tank build after 1990.pdf Fiberglass Double Wall
Gasolia.pdf Gasolia pipe dope
Gasolia.pdf Gasolia pipe dope
FFS-0391 MLD+ Mechanical Leak Detectors Datasheet.pdf Mechanical Leak detector
FFS-0391 MLD+ Mechanical Leak Detectors Datasheet.pdf Mechanical Leak detector
FFS-0391 MLD+ Mechanical Leak Detectors Datasheet.pdf Mechanical Pressurized Line Leak Detection
FFS-0391 MLD+ Mechanical Leak Detectors Datasheet.pdf Mechanical Pressurized Line Leak Detection
Veeder Root Sump & Interstitial Sensors.pdf Non-Discriminating Interstitial Monitoring Sensors
Veeder Root Sump & Interstitial Sensors.pdf Non-Discriminating Interstitial Monitoring Sensors
Veeder Root Sump & Interstitial Sensors.pdf Non-Discriminating Sump Sensor with positive shutdown in Single Wall STP/Tanktop Sump
Veeder Root Sump & Interstitial Sensors.pdf Non-Discriminating Sump Sensor with positive shutdown in Single Wall STP/Tanktop Sump
OPW Compatibility Matrix.pdf Overfill Drop Tube Valve
OPW Compatibility Matrix.pdf Overfill Drop Tube Valve
OC Tank E-85 compatability for tank build after 1990.pdf Single Wall STP/Tanktop Sump
OC Tank E-85 compatability for tank build after 1990.pdf Single Wall STP/Tanktop Sump
Bravo Dispenser Sump.pdf Single Wall UDC Sump
FE Petro Submersible Pump.pdf Submersible pump
FE Petro Submersible Pump.pdf Submersible pump
Bravo Dispenser Sump.pdf Under Dispenser sump
Bravo Dispenser Sump.pdf Under Dispenser sump

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Precision Test (Piping) Pass 3/4/2025 Show History