Division of Petroleum & Chemical Safety

 

Facility: 2040743 Tank: 3

Click for Facility/Tank Ownership history

Capacity: 10000
Product: Gasoline - Premium
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 11/15/2002
Current Age: 22
Install Date: 8/15/2002
Last Used Date:
Product Date: 10/25/2002
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Flexible Non-Corrosive 11/17/2003 N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 8/26/2024 8/26/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 with CSLD 8/26/2024 8/26/2025
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors 9/23/2019 8/26/2024 8/26/2025
Overfill Prev Device Overfill Alarm 1/3/2022 6/30/2022 6/30/2025
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX 3/26/2025 N/A N/A
Piping Single Wall STP/Tanktop Sump 9/30/2020 8/10/2023 8/10/2026
Leak Detect - Piping Sump Sensor 9/11/2019 8/26/2024 8/26/2025
Piping Single Wall Transition Sump East 9/30/2020 8/10/2023 8/10/2026
Leak Detect - Piping Sump Sensor 8/26/2024 8/26/2025
Piping Single Wall Transition Sump West 8/10/2023 8/10/2026
Leak Detect - Piping Sump Sensor 8/26/2024 8/26/2025
Piping Single Wall Transition Sump West Center 3/26/2025 3/26/2028
Leak Detect - Piping Sump Sensor 8/26/2024 8/26/2025
Piping Single Wall Transition Sump East Center 8/10/2023 8/10/2026
Leak Detect - Piping Sump Sensor 8/26/2024 8/26/2025
Spill Contain Device Single Wall Spill Bucket 8/10/2023 8/10/2026
Tank Fiberglass Double Wall Fluid Containment Brine Filled N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 3/26/2025 Show History
Piping Flexible Double Wall Environ Geo Flex Precision Test (Piping) Pass 6/9/2022 Show History