Division of Petroleum & Chemical Safety

 

Facility: 2010063 Tank: 5

Click for Facility/Tank Ownership history

Capacity: 12000
Product: Gasoline - Premium
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 9/11/1989
Current Age: 36
Install Date: 8/1/1989
Last Used Date:
Product Date: 8/1/1989
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp. 7/8 5/18/2023 5/18/2026
Corrosion Prot - Piping Sacrificial Anode Flex Connector STP 5/18/2023 5/18/2026
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp 1/2 5/18/2023 5/18/2026
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp 3/4 5/18/2023 5/18/2026
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp. 5/6 5/18/2023 5/18/2026
Corrosion Prot - Piping Fiberglass Non-Corrosive 12/8/2003 N/A N/A
Corrosion Prot - Tank Sacrificial Anode Cathodic Protection 5/18/2023 5/18/2026
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 9/17/2024 9/17/2025
Leak Detect - Tank Automatic Tank Gauging Gilbarco EMC with CSLD 9/17/2024 9/17/2025
Overfill Prev Device Overfill Drop Tube Valve 12/8/2003 4/24/2023 4/24/2026
Piping Fiberglass Single Wall Piping N/A N/A
Piping Not Installed STP/Tanktop Sump N/A N/A
Spill Contain Device Single Wall Spill Bucket 4/24/2023 4/24/2026
Tank STIP3 Single Wall N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Single Wall Piping Precision Test (Piping) Pass 9/17/2024 Show History
Tank STIP3 Single Wall Precision Test (Tank) Pass 12/7/2023 Show History