Division of Petroleum & Chemical Safety

 

Facility: 1029129 Tank: 10

Click for Facility/Tank Ownership history

Capacity: 6000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 4/28/2025
Current Age: 0
Install Date: 4/10/2025
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number G10233495

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 5/9/2025 5/9/2025 5/9/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD 5/9/2025 5/9/2025 5/9/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors 5/9/2025 5/9/2025 5/9/2026
Overfill Prev Device Overfill Alarm 5/9/2025 5/9/2025 5/9/2028
Overfill Prev Device Overfill Drop Tube Valve 5/9/2025 5/9/2025 5/9/2028
Piping Fiberglass Double Wall NOV Fiberglass Systems Red Thread IIA fiberglass piping 5/9/2025 N/A N/A
Piping Single Wall STP/Tanktop Sump 4/22/2025 4/22/2025 4/22/2028
Leak Detect - Piping Sump Sensor with positive shutdown 5/9/2025 5/9/2025 5/9/2026
Spill Contain Device Double Wall Spill Bucket 4/22/2025 4/22/2025 4/22/2028
Tank Fiberglass Brine Filled Double Wall XERXES 4/10/2025 N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary01292025-070448.pdf Approved 1/29/2025

Compatibility Form Attachments

File Name Description
VR Probes.pdf ATG Probe
Mor Ball Valve.pdf Ball Valves
Caps and seals.pdf Caps and seals
Gilbarco.pdf Dispenser
FF bucket and tube.pdf Double Wall Spill Bucket
VR PLLD.pdf Electronic Pressurized Line Leak Detection
Xerxes Tank.pdf Fiberglass Brine Filled Double Wall
RedThread Pipe.pdf Fiberglass Double Wall fiberglass piping
FF Flex.pdf Flex Connector Steel
Continental E85 hoses.pdf Hose
VR Sensors.pdf Hydrostatic Reservoir Interstitial Monitoring Sensors
Bravo sump.pdf Not Installed UDC Sump
OPW Hanging hardware.pdf Nozzle
RedThread Pipe.pdf Other Riser
OPW 71SOM-512C droptube.pdf Overfill Drop Tube Valve
Gasolia dope.pdf Pipe dope
EBW fire valve.pdf Shear Valves
Xerxes sump.pdf Single Wall STP/Tanktop Sump
FE Petro VL2.pdf Submersible Turbine Pump
VR Sensors.pdf Sump Sensor with positive shutdown

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall NOV Fiberglass Systems Red Thread IIA fiberglass piping Precision Test (Piping) Pass 5/9/2025 Show History
Tank Fiberglass Brine Filled Double Wall XERXES Precision Test (Tank) Pass 5/9/2025 Show History