Division of Petroleum & Chemical Safety

 

Facility: 2023053 Tank: 3

Click for Facility/Tank Ownership history

Capacity: 12000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 4/25/1986
Current Age: 41
Install Date: 1/1/1985
Last Used Date:
Product Date: 1/1/1985
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Sacrificial Anode Cathodic Protection 10/24/2002 5/3/2024 5/3/2027
Corrosion Prot - Tank Sacrificial Anode Cathodic Protection 4/30/2026 4/30/2026 4/30/2029
Corrosion Prot - Tank Sacrificial Anode Cathodic Protection with Dielectric Coating Bonding additional sacrificial anodes to STI P3 tank 10/24/2002 5/3/2024 5/3/2027
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 5/29/2025 5/29/2025 5/29/2026
Leak Detect - Tank Automatic Tank Gauging 10/24/2002 4/30/2025 4/30/2026
Overfill Prev Device Overfill Drop Tube Valve 5/5/2023 5/5/2026
Piping Steel Single Wall Piping 10/24/2002 Not applicable Not applicable
Piping Single Wall STP/Tanktop Sump 4/22/2026 4/22/2026 4/22/2029
Spill Contain Device Double Wall Spill Bucket 4/22/2026 4/22/2026 4/22/2029
Tank STIP3 Single Wall 10/24/2002 Not applicable Not applicable

Failed test = the latest test has failed.

Not applicable = a test does not apply to this equipment type or configuration.

No passing test found = a passing test is expected but was not found from the source data.


Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary06032026-094059.pdf Approved 6/3/2026

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Steel Single Wall Piping Precision Test (Piping) Pass 4/30/2025 Show History
Tank STIP3 Single Wall Precision Test (Tank) Pass 3/8/2022 Show History