Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 4024626 Tank: 1
Click for Facility/Tank Ownership history
Capacity:
10000
Product:
Diesel Fuel
Status:
Currently in use
Regulated Status
Federal
OSFM
First Notify Date:
11/11/1988
Current Age:
36
Install Date:
11/11/1988
Last Used Date:
Product Date:
11/11/1988
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Flexible Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
STIP3 Cathodic Protection with Dielectric Coating
5/15/2025
5/15/2028
Leak Detect - Piping
Mechanical Pressurized Line Leak Detection
5/15/2025
5/15/2026
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 350
5/15/2025
5/15/2026
Overfill Prev Device
Ball Float Vent Valve
5/15/2025
5/15/2028
Piping
Polyethylene Chase
N/A
N/A
Piping
Flexible Single Wall Piping in Chase
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
Leak Detect - Piping
Piping Sump Sensors Not Regulated
N/A
N/A
Spill Contain Device
Single Wall Spill Bucket
3/10/2020
5/15/2025
5/15/2028
Tank
STIP3 Single Wall
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Flexible Double Wall
Precision Test (Piping)
Pass
5/8/2020
Show History
Piping
Flexible Single Wall Piping in Chase
Precision Test (Piping)
Pass
5/15/2025
Show History
Previous Page