Equipment Information
| Equipment Type |
Equipment |
Install Date |
Last Passing Test Date |
Test Expire Date |
Failed Test Date |
|
Corrosion Prot - Piping
|
Sacrificial Anode Flex Connector Flex connector spike anode
|
3/21/2008
|
No passing test found
|
No passing test found
|
|
|
Piping
|
Double Wall steel
|
3/21/2008
|
Not applicable
|
Not applicable
|
|
|
Tank
|
Steel Single Wall
|
6/14/2005
|
Not applicable
|
Not applicable
|
|
Failed test = the latest test has failed.
Not applicable = a test does not apply to this equipment type or configuration.
No passing test found = a passing test is expected but was not found from the source data.