Division of Petroleum & Chemical Safety

 

Facility: 2021028 Tank: 12

Click for Facility/Tank Ownership history

Capacity: 4000
Product: E85
Status: Installed/Not in Use
Regulated Status Federal
OSFM First Notify Date:
Current Age: 0
Install Date: 12/5/2025
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number G-41100614

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Tank Composite Double Wall Modern Welding Glasteel II 12/5/2025 N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary11302025-145932.pdf Approved 11/30/2025

Compatibility Form Attachments

File Name Description
Veeder Root E85 probe 577013-054.pdf ATG Probe
Glasteel II BioFuels Compatibility 2018.pdf Composite Double Wall
ul-approval-letter-ovation-blender-dispensers.pdf DISPENSERS
ffs-0130-defender-series-brochure-713-web.pdf Double Wall Spill Bucket
NUPI UL LETTER - COMPATIBILITY.pdf Flexible Double Wall
Flexing Compatibility Statement.pdf Hose
FE Petro MLD Compatability.pdf Mechanical Pressurized Line Leak Detection
Veeder Root Sensor Compatibility Statement.pdf Non-Discriminating Interstitial Monitoring Sensors
NUPI UL LETTER - COMPATIBILITY.pdf Not Installed UDC Sump
OPW 11a-and-11b-automatic-nozzles.pdf Nozzle
OPW 71SOM_Overfill_Prevention_Valve.pdf Overfill Drop Tube Valve
Gasoila E-Seal.pdf PIPE DOPE
OPW 10 Plus Impact Compatibility.pdf Shear Valve
Bravo Sump Compatibility Statement.pdf Single Wall STP/Tanktop Sump
NUPI UL LETTER - COMPATIBILITY.pdf Single Wall UDC Sump
FE PETRO STPAPM200-VL2 COMPRESSED ffs-0412-60-hz-advanced-protection-submersible-turbine-pumps-datasheet.pdf Submersible Turbine Pump
Veeder Root Sensor Compatibility Statement.pdf Sump Sensor with positive shutdown

Additional Tests

No Additional Tests Listed