Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 2036100 Tank: 3
Click for Facility/Tank Ownership history
Capacity:
6000
Product:
Gasoline - Regular
Status:
Currently in use
Regulated Status
Federal
OSFM
First Notify Date:
6/30/1998
Current Age:
27
Install Date:
3/11/1998
Last Used Date:
Product Date:
3/12/1998
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
12/7/2001
N/A
N/A
Corrosion Prot - Tank
Composite Non-Corrosive
12/7/2001
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
12/7/2001
12/10/2024
12/10/2025
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD
12/10/2024
12/10/2024
12/10/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors
12/10/2024
12/10/2025
Overfill Prev Device
Overfill Alarm
7/2/2024
7/2/2027
Overfill Prev Device
Overfill Drop Tube Valve
12/7/2001
7/2/2024
7/2/2027
Piping
Fiberglass Double Wall Ameron
12/10/2024
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
7/19/2023
7/19/2026
Leak Detect - Piping
Sump Sensor with positive shutdown
12/10/2024
12/10/2025
Spill Contain Device
Double Wall Spill Bucket
11/16/2018
7/19/2023
7/19/2026
Tank
Composite Double Wall
12/7/2001
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Fiberglass Double Wall Ameron
Precision Test (Piping)
Pass
12/10/2024
Show History
Piping
Fiberglass Double Wall Ameron
Precision Test (Piping)
Pass
7/2/2024
Show History
Tank
Composite Double Wall
Precision Test (Tank)
Pass
7/2/2024
Show History
Previous Page