Division of Petroleum & Chemical Safety

 

Facility: 1047759 Tank: 8

Click for Facility/Tank Ownership history

Capacity: 30000
Product: Diesel Fuel
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 2/19/2025
Current Age: 0
Install Date: 6/27/2024
Last Used Date:
Product Date:
Petroleum Use: None
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number G 3870 1501

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Flexible Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection North STP 4/8/2025 4/8/2025 4/8/2026
Leak Detect - Piping Mechanical Pressurized Line Leak Detection South STP 4/8/2025 4/8/2025 4/8/2026
Leak Detect - Piping Siphon Bar 4/8/2025 N/A N/A
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus 4/8/2025 4/8/2025 4/8/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 4/8/2025 4/8/2025 4/8/2026
Overfill Prev Device Overfill Drop Tube Valve 4/8/2025 4/8/2025 4/8/2028
Piping Blending Sump 4/7/2025 4/7/2025 4/7/2028
Leak Detect - Piping Sump Sensor with positive shutdown 4/8/2025 4/8/2025 4/8/2026
Piping Flexible Double Wall Franklin Fueling Systems UPP 4/8/2025 N/A N/A
Piping Single Wall STP/Tanktop Sump 4/7/2025 4/7/2025 4/7/2028
Leak Detect - Piping Sump Sensor with positive shutdown 4/8/2025 4/8/2025 4/8/2026
Piping Single Wall Transition Sump 4/7/2025 4/7/2025 4/7/2028
Leak Detect - Piping Sump Sensor with positive shutdown 4/8/2025 4/8/2025 4/8/2026
Spill Contain Device Double Wall Spill Bucket 4/7/2025 4/7/2025 4/7/2028
Tank Fiberglass Double Wall XERXES 6/27/2024 N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Leak Detect - Piping Siphon Bar Functional Pass 4/8/2025 Show History
Piping Blending Sump Precision Test (Piping) Pass 4/8/2025 Show History
Piping Flexible Double Wall Franklin Fueling Systems UPP Precision Test (Piping) Pass 4/8/2025 Show History
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 4/8/2025 Show History