Division of Petroleum & Chemical Safety

 

Facility: 2034334 Tank: 8

Click for Facility/Tank Ownership history

Capacity: 8000
Product: E85
Status: Installed/Not in Use
Regulated Status Federal
OSFM First Notify Date:
Current Age: 1
Install Date: 3/6/2025
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number F77165527

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 7/24/2026 7/24/2026 7/24/2027
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 with CSLD 7/24/2026 7/24/2026 7/24/2027
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 7/24/2026 7/24/2026 7/24/2027
Overfill Prev Device Overfill Drop Tube Valve 7/24/2026 7/24/2026 7/24/2029
Piping Flexible Double Wall NUPI Smartflex 7/24/2026 Not applicable Not applicable
Piping Single Wall STP/Tanktop Sump 7/24/2026 7/24/2026 7/24/2029
Leak Detect - Piping Sump Sensor with positive shutdown 7/24/2026 7/24/2026 7/24/2027
Spill Contain Device Double Wall Spill Bucket 7/24/2026 7/24/2026 7/24/2029
Tank Composite Double Wall Modern Welding Glasteel II West 3/6/2025 Not applicable Not applicable

Failed test = the latest test has failed.

Not applicable = a test does not apply to this equipment type or configuration.

No passing test found = a passing test is expected but was not found from the source data.


Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary08132026-105137.pdf Approved 8/13/2026

Compatibility Form Attachments

File Name Description
Veeder Root E85 probe 577013-054.pdf ATG Probe
Veeder Root E85 probe 577013-054.pdf ATG Probe
Glasteel II BioFuels Compatibility 2018.pdf Composite Double Wall
Glasteel II BioFuels Compatibility 2018.pdf Composite Double Wall
ul-approval-letter-ovation-blender-dispensers.pdf Dispenser
ul-approval-letter-ovation-blender-dispensers.pdf Dispenser
OPW Belowground Product Compatibility Listing 071518.pdf Double Wall Spill Bucket
OPW Belowground Product Compatibility Listing 071518.pdf Double Wall Spill Bucket
Veeder Root PLLD.pdf ELECTRONIC LINE LEAK DETECTOR
Veeder Root PLLD.pdf ELECTRONIC LINE LEAK DETECTOR
NUPI UL LETTER - COMPATIBILITY.pdf Flexible Double Wall
NUPI UL LETTER - COMPATIBILITY.pdf Flexible Double Wall
Goodyear E85 Ethanol hose.pdf Hose
Goodyear E85 Ethanol hose.pdf Hose
FE Petro MLD Compatability.pdf LEAK DETECTORS
FE Petro MLD Compatability.pdf LEAK DETECTORS
Veeder Root Sensor Compatibility Statement.pdf Non-Discriminating Interstitial Monitoring Sensors
Veeder Root Sensor Compatibility Statement.pdf Non-Discriminating Interstitial Monitoring Sensors
OPW 11a-and-11b-automatic-nozzles.pdf Nozzle
OPW 11a-and-11b-automatic-nozzles.pdf Nozzle
Emco A1100 Drop Tube.pdf Overfill Drop Tube Valve
Emco A1100 Drop Tube.pdf Overfill Drop Tube Valve
Gasoila E-Seal.pdf PIPE DOPE
Gasoila E-Seal.pdf PIPE DOPE
OPW 10_Plus_Series_Emergency_Shut-Off_Valves.pdf Shear Valve
OPW 10_Plus_Series_Emergency_Shut-Off_Valves.pdf Shear Valve
NUPI UL LETTER - COMPATIBILITY.pdf SINGLE WALL DISPENSER SUMPS
NUPI UL LETTER - COMPATIBILITY.pdf SINGLE WALL DISPENSER SUMPS
Bravo Sump Compatibility Statement.pdf Single Wall STP/Tanktop Sump
Bravo Sump Compatibility Statement.pdf Single Wall STP/Tanktop Sump
FE PETRO STPAPM200-VL2 ffs-0412-60-hz-advanced-protection-submersible-turbine-pumps-datasheet.pdf Submersible Turbine Pump
FE PETRO STPAPM200-VL2 ffs-0412-60-hz-advanced-protection-submersible-turbine-pumps-datasheet.pdf Submersible Turbine Pump
Veeder Root Sensor Compatibility Statement.pdf Sump Sensor with positive shutdown
Veeder Root Sensor Compatibility Statement.pdf Sump Sensor with positive shutdown
Veeder Root Sensor Compatibility Statement.pdf Sump Sensor with positive shutdown
Veeder Root Sensor Compatibility Statement.pdf Sump Sensor with positive shutdown

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Flexible Double Wall NUPI Smartflex Precision Test (Piping) Pass 7/24/2026 Show History
Tank Composite Double Wall Modern Welding Glasteel II Precision Test (Tank) Pass 7/24/2026 Show History