Division of Petroleum & Chemical Safety

 

Facility: 3026385 Tank: 10

Click for Facility/Tank Ownership history

Capacity: 6000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 10/25/2024
Current Age: 0
Install Date: 10/17/2024
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number F44205277

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 11/12/2024 3/31/2025 3/31/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD 11/12/2024 3/31/2025 3/31/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors 11/12/2024 3/31/2025 3/31/2026
Overfill Prev Device Overfill Alarm 11/8/2024 11/12/2024 11/12/2027
Overfill Prev Device Overfill Drop Tube Valve 11/8/2024 11/12/2024 11/12/2027
Piping Fiberglass Double Wall NOV Fiberglass Systems Red Thread IIA fiberglass piping 11/12/2024 N/A N/A
Piping Fiberglass Single Wall Piping A.O. Smith 11/12/2024 N/A N/A
Piping Single Wall STP/Tanktop Sump 10/31/2024 10/31/2024 10/31/2027
Leak Detect - Piping Sump Sensor with positive shutdown 11/12/2024 3/31/2025 3/31/2026
Spill Contain Device Double Wall Spill Bucket 10/31/2024 11/12/2024 11/12/2027
Tank Fiberglass Brine Filled Double Wall XERXES 10/17/2024 N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary08212024-132848.pdf Approved 8/21/2024

Compatibility Form Attachments

File Name Description
VR Probes.pdf ATG Probe
Mor Ball Valve.pdf Ball Valves
Caps and seals.pdf Caps and seals
Gilbarco.pdf Dispenser
FF bucket and tube.pdf Double Wall Spill Bucket
VR PLLD.pdf Electronic Pressurized Line Leak Detection
Xerxes Tank.pdf Fiberglass Brine Filled Double Wall
NOVpipe.pdf Fiberglass Double Wall fiberglass piping
NOVpipe.pdf Fiberglass Single Wall Piping
FF Flex.pdf Flex Connector Steel
Husky hose kit.pdf Hanging hardware
VR+Sensors.pdf Hydrostatic Reservoir Interstitial Monitoring Sensors
Bravo sump.pdf Not Installed UDC Sump
FE Petro VL2.pdf Other Pump
NOVpipe.pdf Other Riser
OPW 71SO droptube.pdf Overfill Drop Tube Valve
Gasolia dope.pdf Pipe dope
EBW fire valve.pdf Shear Valves
Bravo sump.pdf Single Wall STP/Tanktop Sump
FE Petro VL2.pdf Submersible pump
VR Sensors.pdf Sump Sensor with positive shutdown

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall NOV Fiberglass Systems Red Thread IIA fiberglass piping Precision Test (Piping) Pass 12/3/2024 Show History
Piping Fiberglass Single Wall Piping A.O. Smith Precision Test (Piping) Pass 11/12/2024 Show History
Tank Fiberglass Brine Filled Double Wall XERXES Precision Test (Tank) Pass 11/12/2024 Show History