Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 1008470 Tank: 6
Click for Facility/Tank Ownership history
Capacity:
20000
Product:
Gasoline - Regular
Status:
Currently in use
Regulated Status
Federal
OSFM
First Notify Date:
7/11/1994
Current Age:
31
Install Date:
4/4/1994
Last Used Date:
Product Date:
4/4/1994
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Mechanical Pressurized Line Leak Detection
2/27/2025
2/27/2026
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 350 with CSLD
2/27/2025
2/27/2026
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors
2/27/2025
2/27/2026
Overfill Prev Device
Overfill Drop Tube Valve
8/27/2020
3/18/2024
3/18/2027
Piping
Composite Chase
8/26/2020
N/A
N/A
Piping
Flexible Double Wall OPW Flexworks
8/26/2020
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
8/26/2020
3/4/2025
3/4/2028
Leak Detect - Piping
Sump Sensor with positive shutdown
8/28/2020
2/27/2025
2/27/2026
Spill Contain Device
Double Wall Spill Bucket
3/18/2024
3/18/2027
Tank
Fiberglass Double Wall
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Composite Chase
Precision Test (Piping)
Pass
2/27/2025
Show History
Piping
Fiberglass Double Wall
Precision Test (Piping)
Pass
6/1/2020
Show History
Piping
Flexible Double Wall OPW Flexworks
Precision Test (Piping)
Pass
2/27/2025
Show History
Tank
Fiberglass Double Wall
Precision Test (Tank)
Pass
9/2/2020
Show History
Previous Page