Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 2025810 Tank: 6
Click for Facility/Tank Ownership history
Capacity:
15000
Product:
Gasoline - Regular
Status:
Currently in use
Regulated Status
Federal
OSFM
First Notify Date:
8/10/2012
Current Age:
12
Install Date:
10/4/2012
Last Used Date:
Product Date:
11/8/2012
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Mechanical Pressurized Line Leak Detection
9/13/2024
9/13/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors With Monitor
10/31/2022
9/13/2024
9/13/2025
Overfill Prev Device
Overfill Alarm
9/13/2024
9/13/2027
Overfill Prev Device
Overfill Drop Tube Valve
9/13/2024
9/13/2027
Piping
Fiberglass Double Wall Ameron Dualoy 3000/LCX
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
9/13/2024
9/13/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
9/13/2024
9/13/2025
Spill Contain Device
Single Wall Spill Bucket
9/13/2024
9/13/2027
Tank
Fiberglass Double Wall XERXES
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Fiberglass Double Wall Ameron Dualoy 3000/LCX
Precision Test (Piping)
Pass
9/13/2024
Show History
Previous Page