Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. - Report is not completed, Facility has 7 E-Stops only 6 tested. |
1, 2, 4, 5, 6, 7, 8 |
Line interstitial sensors have been raised and rendered inoperational. - Dispenser #17 raised sensor |
6 |
Line leak detection equipment in alarm or failed test, must repair or replace. - L33 T6 DSL-Auto STP sump removed from programming. |
2, 3, 4 |
Miscellaneous - 174.370 General Requirement to Maintain All Equipment |
6 |
Miscellaneous - Spill prevention equipment device requires repair |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. - 2 years of records required. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
1, 2, 3, 4, 5, 6, 7, 8 |
Monthly line interstitial sensor records not available. - Records must be available for the previous 2 years. |
1, 2, 3, 4, 5, 6, 7, 8 |
Piping interstitial must be open in all sumps - Dispensers 2-18 |
6 |
Precision line test required. - Line leaking at T6 STP sump, repair leak, remove product and test the line. |
1, 2, 3, 4, 5, 6, 7, 8 |
Required monthly tank interstitial sensor records not available. - Records must be available for the previous 2 years. |