1 |
Annual electronic line leak detector test not completed. |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
1 |
Annual leak detection certification not completed (Required annually). |
1 |
Line interstitial sensor functional test not accomplished (Required annually). |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
1 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). |
1 |
Piping interstitial must be open in all sumps |
1 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
1 |
Tank interstitial sensor functional test not accomplished (Required annually.). |
1 |
Triennial spill prevention equipment testing not completed. |
1 |
Triennial testing for qualifying piping containment sump not completed (Required every 3 years). |