Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation |
1, 2, 3 |
Line interstitial sensors have been raised and rendered inoperational. - Dispeneser 1/2 and Prem STP. |
3 |
Line leak detection equipment in alarm or failed test, must repair or replace. - L10: Premum Subpump STP Sump Fuel Alarm. |
Facility |
Missing copies of current testing certificates for operator training - No class A/B or class C certifiactes availble for inspection. |
Facility |
Missing list of designated Class A/B & C Operators |
2, 3 |
Open electrical conduit or junction boxes. - Premium STP sump electrical conduit and wiring is bad. Intersitial conduit is bad on Premium/Diesel Sensor and requires replaced/repaired. |
1, 2, 3 |
Piping sump tested triennially using low level positive shut off option. Sump does not meet low level test requirements. See remarks. Perform standard hydrostatic test on sump. - Sump sensor alarm, positive shut down not functional, raised sensors, and cracked STP sumps. All sumps shall be tested by a standard hydrostatic sump test due to the violations. |
2, 3 |
Tank interstitial sensors in alarm or failed test, must repair or replace. - L14: Sensor Out Alarm. |
1, 2, 3 |
Verify and test piping sump sensor for positive shutdown - All sensors must be verified and re-tested for positive shutdown. |