Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation |
5, 6 |
Install corrosion protection under dispensers to protect exposed flex connectors and other metal portions of product piping. - Dispensers 3, 4, 5, 6 only. Under dispenser containment sumps may be installed and kept dry in lieu of installing corrosion protection on metal exposed piping. |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. - No reports completed June 2024. |
Facility |
Missing copies of current testing certificates for operator training - Certificates are expired. |
Facility |
Missing list of designated Class A/B & C Operators |
5, 6 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |