Notice of Violatlions (Current)
NOV Number:
E0020253007
(Pending)
Issue Date:
11/12/2025
Expiration Date:
1/11/2026
View NOV Form
| Tanks |
Violations |
| 3, 4 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). - Testing was due to be completed by 11/2/2025. |
| 3, 4 |
Triennial spill prevention equipment testing not completed. - Testing was due to be completed by 11/2/2025. |
NOV Number:
E0020253244
(Pending)
Issue Date:
12/11/2025
Expiration Date:
2/9/2026
View NOV Form
| Tanks |
Violations |
| Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
| 3, 4 |
Annual leak detection certification not completed (Required annually). |
| 3 |
Annual line precision and mechanical line leak detector functional test not completed. |
| Facility |
Missing copies of Annual Walkthrough Inspection Report. |
| 3, 4 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
| 3, 4 |
Tank interstitial sensor functional test not accomplished (Required annually.). |