4, 5 |
Annual electronic line leak detector test not completed. |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
4, 5 |
Annual leak detection certification not completed (Required annually). |
4, 5 |
Document that emergency shut-off (shear valves) are in proper working order |
4, 5 |
Flex connector sacrificial anode system not tested (required every 3 years) - Test anodes and replace as needed |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |