Facility |
Miscellaneous - Shear valve leaking on dispenser 5/6 and 29/28S. Fluids in the containment. Repair or replace to prevent further release.
Section 175.720 Defective or Non-Compliant Equipment and Emergency Action by OSFM
a)Pursuant to Section 6 of the Gasoline Storage Act [430 ILCS 15/6], whenever necessary or
appropriate to assure that the public health or safety is not threatened, OSFM shall have the authority to undertake emergency action whenever there is a release or substantial threat of a release of petroleum or regulated substances from a UST. |
1, 2, 3, 4, 5, 6, 7 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). - Overfill alarm testing on all tanks and Ball Float testing on Tanks 1-6 expired 1/24/2025. |
4, 6 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
1, 2, 3, 4, 5, 6, 7 |
Triennial spill prevention equipment testing not completed. - Expired 9/17/2024. |
1, 2, 3, 4, 5, 6, 7 |
Triennial testing for qualifying piping containment sump not completed (Required every 3 years). - Expired 9/17/2024. |