Notice of Violations (Current)
NOV Number:
E0020251080
(Pending)
Issue Date:
4/21/2025
Expiration Date:
6/20/2025
View NOV Form
Tanks |
Violation |
1 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - Tank 1 STP Sump cover lid needs to be repaired or replaced. |
1, 2, 3, 4 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). - Overfill Alarm test has expired. |
1, 3, 4 |
Triennial spill prevention equipment testing not completed. |
1, 2, 3, 4 |
Triennial testing for qualifying piping containment sump not completed (Required every 3 years). |