Notice of Violations (Current)
NOV Number:
E0020251151
(Pending)
Issue Date:
5/1/2025
Expiration Date:
6/30/2025
View NOV Form
Tanks |
Violation |
3, 4 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - STP gound cover must be removable to allow for inspection. |
2 |
Piping sacrificial anode system not tested (required every 3 years). - Disp 1/2 |
1, 2, 3, 4 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |