Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation |
2, 3, 4 |
Annual electronic line leak detector test not completed. - Expired 9/11/2025 |
1, 2, 3, 4 |
Annual leak detection certification not completed (Required annually). - Expired 9/11/2025 |
1, 2 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - STP inner covers deteriorated or missing repair or replace inner covers. |
3 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - STP ground covers missining handles- repair or replace to allow for inspection. |
3 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - STP inner covers deteriorated or missing repair or replace inner covers. |
4 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - STP ground covers missining handles- repair or replace to allow for inspection. |
4 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - STP inner covers deteriorated or missing repair or replace inner covers. |
1 |
Miscellaneous - Obtain permit to reintall C/P in Dispenser 9/10, 11/12, 13/14, 15/16 |
1 |
Miscellaneous - Three-year third-party testing required on sacrificial anode/cathodic protection system. Perform testing and maintain passing documentation on site for review by OSFM Inspector. |
2 |
Miscellaneous - Obtain permit to reintall C/P in Dispenser 9/10, 11/12, 13/14, 15/16 |
2 |
Miscellaneous - Three-year third-party testing required on sacrificial anode/cathodic protection system. Perform testing and maintain passing documentation on site for review by OSFM Inspector. |
3 |
Miscellaneous - Obtain permit to reintall C/P in Dispenser 9/10, 11/12, 13/14, 15/16 |
3 |
Miscellaneous - Three-year third-party testing required on sacrificial anode/cathodic protection system. Perform testing and maintain passing documentation on site for review by OSFM Inspector. |
4 |
Miscellaneous - Obtain permit to reintall C/P in Dispenser 9/10, 11/12, 13/14, 15/16 |
4 |
Miscellaneous - Three-year third-party testing required on sacrificial anode/cathodic protection system. Perform testing and maintain passing documentation on site for review by OSFM Inspector. |
1, 2, 3, 4 |
Precision tank test required. - A tank precision test is required because of missing passing monthly leak reports. |
1, 2, 3, 4 |
Required monthly tank leak test records not available. - Missing monthly passing reports for the last ten months. |
1, 2, 3, 4 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |