Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility Details
Facility Number:
2047391
Status:
Active
Facility Name:
7-Eleven Store #38789
Address:
120 W North Ave
Melrose Park, IL 60164
County:
Cook
Property Parcel:
15-02-116-009-0000
Facility Type:
Attended Self-Service Station
Owner Type:
Private
Green Tag Decal:
Y001482
Green Tag Issue Date:
6/26/2023
Green Tag Expiration Date:
12/31/2025
Owner Details
Owner Name:
7-Eleven, Inc.
Owner Address:
3200 Hackberry Road - Gas Compliance
Irving, TX 75063
Owner Status:
Current Owner
Purchase Date:
Type of Financial Responsibility:
Commercial Insurance
Financial Responsibility Reporting Due Date:
12/13/2025
Motor Fuel Dispensing Permits
MFD Permit Type
Issue Date
Expiration Date
Self Service
5/30/2023
12/31/2025
Owner Summary
Click for Facility/Tank Ownership history
Owner Number
Owner Name
Owner Status
Purchase Date
U0014207
7-Eleven, Inc.
Current Owner
Permits (Unexpired)
Click for permit history
No Active Permits Found
Notice of Violations (Current)
No Notice of Violations Found
IEMA Numbers Associated with the Facility
No IEMA Numbers Found
LUST
Fund Eligibility and Deductibility Determinations
No Applications Found
Pay Tank Fees Online
Tank Information
Tank Number 1
Capacity:
20000
Petroleum Use:
Product:
Gasoline - Regular
CERCLA Substance:
Status:
Currently in use
CAS Code:
Regulated Status:
Federal
Removed Date:
OSFM
First Notify Date:
3/24/2023
Abandoned Material:
Current Age:
3
Abandoned Date:
Install Date:
4/1/2022
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Flexible Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Mechanical Pressurized Line Leak Detection
5/16/2024
5/16/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors With Monitor
5/16/2024
5/16/2025
Overfill Prev Device
Overfill Drop Tube Valve
5/23/2023
5/23/2026
Piping
Polyethylene Chase
N/A
N/A
Piping
Flexible Double Wall OPW Flexworks
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Spill Contain Device
Double Wall Spill Bucket
5/23/2023
5/23/2026
Tank
Fiberglass Double Wall XERXES
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Flexible Double Wall OPW Flexworks
Precision Test (Piping)
Pass
5/23/2023
Piping
Polyethylene Chase
Precision Test (Piping)
Pass
5/23/2023
Tank
Fiberglass Double Wall XERXES
Precision Test (Tank)
Pass
5/23/2023
Tank Number 2
Capacity:
8000
Petroleum Use:
Product:
Gasoline - Premium
CERCLA Substance:
Status:
Currently in use
CAS Code:
Regulated Status:
Federal
Removed Date:
OSFM
First Notify Date:
3/24/2023
Abandoned Material:
Current Age:
3
Abandoned Date:
Install Date:
4/1/2022
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Flexible Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Mechanical Pressurized Line Leak Detection
5/16/2024
5/16/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors With Monitor
5/16/2024
5/16/2025
Overfill Prev Device
Overfill Drop Tube Valve
5/23/2023
5/23/2026
Piping
Polyethylene Chase
N/A
N/A
Piping
Flexible Double Wall OPW Flexworks
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Spill Contain Device
Double Wall Spill Bucket
5/23/2023
5/23/2026
Tank
Fiberglass Double Wall XERXES
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Flexible Double Wall OPW Flexworks
Precision Test (Piping)
Pass
5/23/2023
Piping
Polyethylene Chase
Precision Test (Piping)
Pass
5/23/2023
Tank
Fiberglass Double Wall XERXES
Precision Test (Tank)
Pass
5/23/2023
Tank Number 3
Capacity:
12000
Petroleum Use:
None
Product:
Diesel Fuel
CERCLA Substance:
Status:
Currently in use
CAS Code:
Regulated Status:
Federal
Removed Date:
OSFM
First Notify Date:
3/24/2023
Abandoned Material:
Current Age:
3
Abandoned Date:
Install Date:
4/1/2022
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Flexible Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Mechanical Pressurized Line Leak Detection
5/16/2024
5/16/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors With Monitor
5/16/2024
5/16/2025
Overfill Prev Device
Overfill Drop Tube Valve
5/23/2023
5/23/2026
Piping
Polyethylene Chase
N/A
N/A
Piping
Flexible Double Wall OPW Flexworks
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Spill Contain Device
Double Wall Spill Bucket
5/23/2023
5/23/2026
Tank
Fiberglass Double Wall XERXES
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Flexible Double Wall OPW Flexworks
Precision Test (Piping)
Pass
5/23/2023
Piping
Polyethylene Chase
Precision Test (Piping)
Pass
5/23/2023
Tank
Fiberglass Double Wall XERXES
Precision Test (Tank)
Pass
5/23/2023
Tank Number 4
Capacity:
20000
Petroleum Use:
None
Product:
Diesel Fuel
CERCLA Substance:
Status:
Currently in use
CAS Code:
Regulated Status:
Federal
Removed Date:
OSFM
First Notify Date:
3/24/2023
Abandoned Material:
Current Age:
3
Abandoned Date:
Install Date:
4/8/2022
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Flexible Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Mechanical Pressurized Line Leak Detection
5/16/2024
5/16/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors With Monitor
5/16/2024
5/16/2025
Overfill Prev Device
Overfill Drop Tube Valve
5/23/2023
5/23/2026
Piping
Polyethylene Chase
N/A
N/A
Piping
Flexible Double Wall OPW Flexworks
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Spill Contain Device
Double Wall Spill Bucket
5/23/2023
5/23/2026
Tank
Fiberglass Double Wall XERXES
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Flexible Double Wall OPW Flexworks
Precision Test (Piping)
Pass
5/23/2023
Piping
Polyethylene Chase
Precision Test (Piping)
Pass
5/23/2023
Tank
Fiberglass Double Wall XERXES
Precision Test (Tank)
Pass
5/23/2023
Dispenser Information
Name\ID 1/2
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Name\ID 11/12
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Name\ID 13/14
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Name\ID 15/16
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Name\ID 17M/18M
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Name\ID 17S
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Name\ID 18S
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Name\ID 3/4
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Name\ID 5/6
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Name\ID 7/8
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
Name\ID 9/10
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
8/19/2022
8/19/2025
Leak Detect - Piping
Sump Sensor with positive shutdown
5/16/2024
5/16/2025
MFD
Motorfuel Dispensing Forms
Facility Number
Name
City
Received Date
Letter
2047391
7-Eleven Store #38789
Melrose Park
10/03/2022
Letter
Form