Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. - All emergency shutoff switches shall be tested annually to verify they shut down all STPs or dispensers. Perform test, complete form (form is available at www.sfm.illinois.gov) and maintain 2 years on site with other annual testing documentation. |
Facility |
Facility Operation and Maintenance Plan not completed or available. - Adopt and implement a written operations and maintenance plan, signed by both the owner and either a Class A or Class B Operator designated for the UST facility An Operations & Maintenance template is available at www.sfm.illinois.gov to download and complete O & M template and maintain completed form on site. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. - Annual Walkthrough by a licensed contractor shall be conducted and 2 years documentation maintained on site. |
Facility |
Missing copy of emergency instructions or emergency procedures plan - Emergency Procedures plan shall be maintained on site for viewing and reference as necessary (See Operator Training Rules 176.645). The emergency plan template is available on the OSFM website.
|
Facility |
Missing list of designated Class A/B & C Operators - A comprehensive list of Class A / B / C Operator(s) shall be maintained on site and must be current. |
1, 2 |
Precision tank test required. - Precision tank test is required on tank(s) if you cannot provide 24 months’ worth of tank “NORMAL” from ATG. |
1, 2 |
Required monthly tank leak test records not available. - Maintain one PASSing report per TANK, per month, from ATG. Must maintain 24 months’ worth. |
1, 2 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). - Provide documentation that annual testing of all shear valves has been conducted and passed. Must maintain 2 years of inspection reports. |
1, 2 |
Water in containment without required sensors – install cathodic protection on all exposed steel piping or make containment watertight. By 10/13/28, all containments must be watertight and any CP installed in containments must be removed. - Under dispenser containment sump 5/6 contains liquid which is corroding the exposed steel. Install approved cathodic protection to prevent further corrosion of dispenser piping and related piping components. |