Notice of Violations (Current)
NOV Number:
E0020261819
(Pending)
Issue Date:
7/15/2026
Expiration Date:
9/13/2026
View NOV Form
| Tanks |
Violations |
| 1 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - The regular STP sump lid is broken and needs to be replaced. |
| 1 |
Miscellaneous - Probe cap is off. STP sump is filled with water to top of probe drop tube. |
| 1, 2 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. - 175.405 a) 1) A) Spill containment equipment that will prevent release of product to
the environment when the transfer hose is detached from the fill
pipe (e.g., a spill catch basin). Spill containment equipment shall
be maintained in a dry, clean state. |