Deficiencies (Current)
NOV Number:
E0020240160
(Pending)
Issue Date:
1/17/2024
Expiration Date:
4/19/2024
View NOV Form
Tanks |
Deficiency |
2 |
Spill prevention equipment failed triennial testing. Must be repaired or replaced. - STP piping containment sump failed. Must repair or replace and have retested with passing results. |
NOV Number:
E0020240530
(Pending)
Issue Date:
2/27/2024
Expiration Date:
4/27/2024
View NOV Form
Tanks |
Deficiency |
1, 2, 3 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. - Spill buckets |
2 |
Triennial testing for qualifying piping containment sump not completed (Required every 3 years). - 11/8/23 Contractor failed the Regular North STP because it has a torn boot not allowing the containment to hold liquid. MUST be repaired or replaced. |