Notice of Violatlions (Current)
NOV Number:
E0020252618
(Pending)
Issue Date:
10/6/2025
Expiration Date:
12/5/2025
View NOV Form
| Tanks |
Violations |
| Facility |
Financial responsibility must be reported yearly - Section 176.220 Proof of Financial Responsibility
a) Proof of financial responsibility for Section 176.215(a), (b), (c), (d) or (e) shall be
maintained on the respective OSFM forms, which may be complemented by
industry customs and practices so long as the OSFM form language is utilized.
The forms are available at https://sfm.illinois.gov/about/divisions/petroleumchemical-
safety/applications-and-forms.html |
| 1, 2, 3 |
Required monthly tank leak test records not available. - NOV comply by date has not expired. I was in the area. |
| 1, 3 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. - 175.405 a) 1) A) Spill containment equipment that will prevent release of product to
the environment when the transfer hose is detached from the fill
pipe (e.g., a spill catch basin). Spill containment equipment shall
be maintained in a dry, clean state. |
| 2 |
Tank monitor does not appear to function properly and requires maintenance. - T2 shows an invalid tank test. All tanks need to have passing tank test. |
NOV Number:
E0020253188
(Pending)
Issue Date:
12/3/2025
Expiration Date:
2/1/2026
View NOV Form
| Tanks |
Violations |
| 3 |
Miscellaneous - ATG shows 29 Gallons 1.20" of water. |
NOV Number:
E0020253301
(Pending)
Issue Date:
12/18/2025
Expiration Date:
2/16/2026
View NOV Form
| Tanks |
Violations |
| 1, 2, 3 |
Miscellaneous - Facility was closed and the dispensers were still on for customers to pump product. |