Notice of Violatlions (Current)
NOV Number:
E0020251404
(Pending)
Issue Date:
6/2/2025
Expiration Date:
8/1/2025
View NOV Form
Tanks |
Violations |
1, 2, 3 |
Line leak detection equipment in alarm or failed test, must repair or replace. - ATG showing all 3 sump sensors in alarm |
1, 2, 3 |
Tank interstitial sensors in alarm or failed test, must repair or replace. - Contractor performed work and veeder root print out showed normal sensors at time of work completed. At time of reinspect RUL and Diesel tank top sumps had water in them and sensor was in alarm. Veeder root also showed Diesel interstitial sensor in alar |
1, 2, 3 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. - Provide documentation of repairs made |