Notice of Violatlions (Current)
NOV Number:
E0020251447
(Referred to Legal)
Issue Date:
6/5/2025
Expiration Date:
8/4/2025
View NOV Form
Tanks |
Violations |
2 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - Both STP's are missing lids for containments and the Regular tank STP containment is cracked on top of contianment. Repair/Replace. |
Facility |
Facility Operation and Maintenance Plan not completed or available. - Facility Operations and Maintenance Plan does not meet requirements of new rules or is not available. Form and be found at https://sfm.illinois.gov/content/dam/soi/en/web/sfm/sfmdocuments/documents/oandmtemplate.pdf to download and complete O & M template and maintain completed form on site. |
1, 2 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. - (Both STP's) |