6, 7, 8, 9 |
Annual electronic line leak detector test not completed. |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. - All emergency shutoff switches shall be tested annually to verify they shut down all STPs and dispensers. Form can be found at https://sfm.illinois.gov to download and complete. |
6, 7, 8, 9 |
Annual leak detection certification not completed (Required annually). - Annual leak detection certification (ATG) not completed. Testing shall be completed and submitted to OSFM. |
Facility |
Facility Operation and Maintenance Plan not completed or available. - Facility Operations and Maintenance Plan does not meet requirements of new rules or is not available. Go to https://sfm.illinois.gov to download and complete O & M template and maintain completed form on site. |
6, 7, 8, 9 |
Line interstitial sensor functional test not accomplished (Required annually). |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. - 30-day Walkthrough Inspection shall be completed, and documentation maintained on site. 30-Day Walkthrough Inspection form available at https://sfm.illinois.gov. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. - Annual Walkthrough by a licensed contractor shall be conducted and documentation maintained on site. |
Facility |
Missing copy of emergency instructions or emergency procedures plan - Form can be found at https://sfm.illinois.gov to download and complete. |
Facility |
Missing list of designated Class A/B & C Operators - Form can be found at https://sfm.illinois.gov to download and complete. |
6, 7, 8, 9 |
Monthly line interstitial sensor records not available. - Maintain one NORMAL report per LINE, per month, from ATG. (Liquid Status) |
6, 7, 8, 9 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). - Provide documentation that annual testing of all shear valves has been conducted and passed. Go to https://sfm.illinois.gov to print out the Shear Valve inspection form. |
6, 7, 8, 9 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
6, 7, 8, 9 |
Tank interstitial sensor functional test not accomplished (Required annually). |