Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility Details
Facility Number:
2023173
Status:
Active
Facility Name:
Rock N Roll BP 157
Address:
631 North LaSalle Street
Chicago, IL 60610
County:
Cook
Property Parcel:
17-09-225-025
Facility Type:
Attended Self-Service Station
Owner Type:
Private
Green Tag Decal:
Z002180
Green Tag Issue Date:
5/6/2024
Green Tag Expiration Date:
12/31/2026
Owner Details
Owner Name:
Graham Enterprise, Inc.
Owner Address:
750 Bunker Court
Vernon Hills, IL 60061
Owner Status:
Current Owner
Purchase Date:
1/14/2010
Type of Financial Responsibility:
Self-Insurance
Financial Responsibility Reporting Due Date:
6/28/2025
Motor Fuel Dispensing Permits
MFD Permit Type
Issue Date
Expiration Date
Self Service
5/6/2024
12/31/2026
Owner Summary
Click for Facility/Tank Ownership history
Owner Number
Owner Name
Owner Status
Purchase Date
U0023084
Graham Enterprise, Inc.
Current Owner
1/14/2010
U0000552
BP Products North America, Inc.
Former Owner
4/10/1997
U0027493
Amoco Oil Company
Former Owner
1/1/1982
Permits (Unexpired)
Click for permit history
No Active Permits Found
Notice of Violations (Current)
No Notice of Violations Found
IEMA Numbers Associated with the Facility
IEMA Number
Inspection Date
Inspection Type
Permit Number
20-0856
10/8/2020
Removal Log
01215-2020REM
LUST
Fund Eligibility and Deductibility Determinations
IEMA Number
Status
OSFM Received Date
OSFM Response Date
Deductible
Letter
20200856
Eligible
12/15/2020
12/15/2020
$5,000
Letter
20200798
Eligible
12/15/2020
12/15/2020
$5,000
Letter
Pay Tank Fees Online
Tank Information
Tank Number 1
Capacity:
8000
Petroleum Use:
Product:
Diesel Fuel
CERCLA Substance:
Status:
Removed
CAS Code:
Regulated Status:
Federal
Removed Date:
10/8/2020
OSFM
First Notify Date:
4/25/1986
Abandoned Material:
Current Age:
23
Abandoned Date:
Install Date:
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
5/20/2019
5/20/2020
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 350R with CSLD
5/20/2019
5/20/2020
Overfill Prev Device
Overfill Drop Tube Valve
2/28/2020
2/28/2023
Piping
Fiberglass Double Wall Ameron
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
2/28/2020
2/28/2023
Leak Detect - Piping
Sump Sensor
5/20/2019
5/20/2020
Spill Contain Device
Single Wall Spill Bucket
2/28/2020
2/28/2023
Tank
Fiberglass Single Wall
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Fiberglass Double Wall Ameron
Precision Test (Piping)
Pass
5/20/2019
Tank Number 2
Capacity:
12000
Petroleum Use:
Product:
Gasoline - Regular
CERCLA Substance:
Status:
Removed
CAS Code:
Regulated Status:
Federal
Removed Date:
10/8/2020
OSFM
First Notify Date:
4/25/1986
Abandoned Material:
Current Age:
23
Abandoned Date:
Install Date:
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
5/20/2019
5/20/2020
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 350R with CSLD
5/20/2019
5/20/2020
Overfill Prev Device
Overfill Drop Tube Valve
2/28/2020
2/28/2023
Piping
Fiberglass Double Wall Ameron
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
2/28/2020
2/28/2023
Leak Detect - Piping
Sump Sensor
5/20/2019
5/20/2020
Spill Contain Device
Single Wall Spill Bucket
2/28/2020
2/28/2023
Tank
Fiberglass Single Wall
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Fiberglass Double Wall Ameron
Precision Test (Piping)
Pass
5/20/2019
Tank
Fiberglass Single Wall
Precision Test (Tank)
Pass
5/20/2019
Tank Number 3
Capacity:
12000
Petroleum Use:
Product:
Gasoline - Premium
CERCLA Substance:
Status:
Removed
CAS Code:
Regulated Status:
Federal
Removed Date:
10/8/2020
OSFM
First Notify Date:
4/25/1986
Abandoned Material:
Current Age:
23
Abandoned Date:
Install Date:
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
5/20/2019
5/20/2020
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 350R with CSLD
5/20/2019
5/20/2020
Overfill Prev Device
Overfill Drop Tube Valve
2/28/2020
2/28/2023
Piping
Fiberglass Double Wall Ameron
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
2/28/2020
2/28/2023
Leak Detect - Piping
Sump Sensor
5/20/2019
5/20/2020
Spill Contain Device
Single Wall Spill Bucket
2/28/2020
2/28/2023
Tank
Fiberglass Single Wall
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Fiberglass Double Wall Ameron
Precision Test (Piping)
Pass
5/20/2019
Tank Number 4
Capacity:
12000
Petroleum Use:
Product:
Gasoline - Regular
CERCLA Substance:
Status:
Removed
CAS Code:
Regulated Status:
Federal
Removed Date:
10/8/2020
OSFM
First Notify Date:
4/25/1986
Abandoned Material:
Current Age:
23
Abandoned Date:
Install Date:
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
5/20/2019
5/20/2020
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 350R with CSLD
5/20/2019
5/20/2020
Overfill Prev Device
Overfill Drop Tube Valve
2/28/2020
2/28/2023
Piping
Fiberglass Double Wall Ameron
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
2/28/2020
2/28/2023
Leak Detect - Piping
Sump Sensor
5/20/2019
5/20/2020
Spill Contain Device
Single Wall Spill Bucket
2/28/2020
2/28/2023
Tank
Fiberglass Single Wall
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Fiberglass Double Wall Ameron
Precision Test (Piping)
Pass
5/20/2019
Tank Number 5
Capacity:
30000
Petroleum Use:
Product:
Gasoline - Regular
CERCLA Substance:
Status:
Currently in use
CAS Code:
Regulated Status:
Federal
Removed Date:
OSFM
First Notify Date:
5/10/2021
Abandoned Material:
Current Age:
3
Abandoned Date:
Install Date:
10/19/2020
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
5/8/2021
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
6/24/2024
6/24/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors With Monitor
6/24/2024
6/24/2025
Overfill Prev Device
Overfill Alarm
6/24/2024
6/24/2027
Overfill Prev Device
Overfill Drop Tube Valve
6/24/2024
6/24/2027
Piping
Flexible Double Wall NUPI Smartflex
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
6/24/2024
6/24/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
6/24/2024
6/24/2025
Spill Contain Device
Single Wall Spill Bucket
6/24/2024
6/24/2027
Tank
Fiberglass Double Wall Containment Solutions
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Flexible Double Wall NUPI Smartflex
Precision Test (Piping)
Pass
6/24/2024
Tank
Fiberglass Double Wall Containment Solutions
Precision Test (Tank)
Pass
5/10/2021
Tank Number 6
Capacity:
15000
Petroleum Use:
Product:
Gasoline - Premium
CERCLA Substance:
Status:
Currently in use
CAS Code:
Regulated Status:
Federal
Removed Date:
OSFM
First Notify Date:
5/10/2021
Abandoned Material:
Current Age:
3
Abandoned Date:
Install Date:
10/19/2020
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
5/8/2021
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
6/24/2024
6/24/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors With Monitor
6/24/2024
6/24/2025
Overfill Prev Device
Overfill Alarm
6/24/2024
6/24/2027
Overfill Prev Device
Overfill Drop Tube Valve
6/24/2024
6/24/2027
Piping
Flexible Double Wall NUPI Smartflex
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
6/24/2024
6/24/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
6/24/2024
6/24/2025
Spill Contain Device
Single Wall Spill Bucket
6/24/2024
6/24/2027
Tank
Fiberglass Double Wall Containment Solutions
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Flexible Double Wall NUPI Smartflex
Precision Test (Piping)
Pass
6/24/2024
Tank
Fiberglass Double Wall Containment Solutions
Precision Test (Tank)
Pass
5/10/2021
Tank Number 7
Capacity:
7000
Petroleum Use:
Product:
B-11
CERCLA Substance:
Status:
Currently in use
CAS Code:
Regulated Status:
Federal
Removed Date:
OSFM
First Notify Date:
5/10/2021
Abandoned Material:
Current Age:
3
Abandoned Date:
Install Date:
10/19/2020
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
5/8/2021
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
6/24/2024
6/24/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors With Monitor
6/24/2024
6/24/2025
Overfill Prev Device
Overfill Alarm
6/24/2024
6/24/2027
Overfill Prev Device
Overfill Drop Tube Valve
6/24/2024
6/24/2027
Piping
Flexible Double Wall NUPI Smartflex
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
6/24/2024
6/24/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
6/24/2024
6/24/2025
Spill Contain Device
Single Wall Spill Bucket
6/24/2024
6/24/2027
Tank
Fiberglass Double Wall Containment Solutions
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Flexible Double Wall NUPI Smartflex
Precision Test (Piping)
Pass
6/24/2024
Tank
Fiberglass Double Wall Containment Solutions
Precision Test (Tank)
Pass
5/10/2021
Tank Number 8
Capacity:
7000
Petroleum Use:
Product:
E85
CERCLA Substance:
Status:
Currently in use
CAS Code:
Regulated Status:
Federal
Removed Date:
OSFM
First Notify Date:
5/10/2021
Abandoned Material:
Current Age:
3
Abandoned Date:
Install Date:
10/19/2020
Red Tag Issue Date:
Last Used Date:
Fee Due:
$0.00
Product Date:
5/8/2021
Equipment
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
6/24/2024
6/24/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors With Monitor
6/24/2024
6/24/2025
Overfill Prev Device
Overfill Alarm
6/24/2024
6/24/2027
Overfill Prev Device
Overfill Drop Tube Valve
6/24/2024
6/24/2027
Piping
Flexible Double Wall NUPI Smartflex
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
6/24/2024
6/24/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
6/24/2024
6/24/2025
Spill Contain Device
Single Wall Spill Bucket
6/24/2024
6/24/2027
Tank
Fiberglass Double Wall Containment Solutions
N/A
N/A
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
Piping
Flexible Double Wall NUPI Smartflex
Precision Test (Piping)
Pass
6/24/2024
Tank
Fiberglass Double Wall Containment Solutions
Precision Test (Tank)
Pass
5/10/2021
Dispenser Information
Name\ID 1/2
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
6/24/2024
6/24/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
6/24/2024
6/24/2025
Name\ID 11/12
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
6/24/2024
6/24/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
6/24/2024
6/24/2025
Name\ID 13/14
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
5/7/2021
5/7/2024
Leak Detect - Piping
Sump Sensor
5/20/2019
5/20/2020
Name\ID 15/16
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
5/7/2021
5/7/2024
Leak Detect - Piping
Sump Sensor
5/20/2019
5/20/2020
Name\ID 3/4
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
6/24/2024
6/24/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
6/24/2024
6/24/2025
Name\ID 5/6
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
6/24/2024
6/24/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
6/24/2024
6/24/2025
Name\ID 7/8
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
6/24/2024
6/24/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
6/24/2024
6/24/2025
Name\ID 9/10
Status:
Active
Equipment Type
Equipment
Last Passing Date
Test Expire Date
Dispenser
Single Wall UDC Sump
6/24/2024
6/24/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
6/24/2024
6/24/2025
MFD
Motorfuel Dispensing Forms
Facility Number
Name
City
Received Date
Letter
2023173
Rock N Roll BP 157
Chicago
05/10/2021
Letter
Form