5, 6 |
Annual electronic line leak detector test not completed. |
5, 6 |
Annual leak detection certification not completed (Required annually). |
5, 6 |
Document that emergency shut-off (shear valves) are in proper working order |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
Facility |
Missing copies of current testing certificates for operator training |
Facility |
Missing list of designated Class A/B & C Operators |
5, 6 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
5, 6 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
5, 6 |
Tank interstitial sensor functional test not accomplished (Required annually). |