11, 12, 13 |
Annual electronic line leak detector test not completed. |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
11, 12, 13 |
Annual leak detection certification not completed (Required annually). |
11, 12, 13 |
Line interstitial sensor functional test not accomplished (Required annually). |
11, 12 |
Miscellaneous - Petroleum and hazardous substances shall be transferred from tanks by
means of fixed pumps designed and equipped to allow control of the flow and to
prevent leakage. 175.450.a |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
11, 12, 13 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). |
11, 12, 13 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
11, 12, 13 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
11, 12, 13 |
Tank interstitial sensor functional test not accomplished (Required annually). |
11, 12, 13 |
Triennial spill prevention equipment testing not completed. |
11, 12, 13 |
Triennial testing for qualifying piping containment sump not completed (Required every 3 years). |