5, 6 |
Annual electronic line leak detector test not completed. |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
5, 6 |
Annual leak detection certification not completed (Required annually). |
5, 6 |
Line interstitial sensor functional test not accomplished (Required annually). |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
5, 6 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
5, 6 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. - Both containments full of water |
5, 6 |
Tank interstitial sensor functional test not accomplished (Required annually). |
5, 6 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. |