Notice of Violations (Current)
NOV Number:
E0020250342
(Pending)
Issue Date:
2/7/2025
Expiration Date:
4/8/2025
View NOV Form
Tanks |
Violation |
1 |
Miscellaneous - ATG shows T1 regular 16 gallon .85" of water in tank. |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. - 30 day walkthrough is a required and shall be performed monthly. |
1, 2, 3 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. - 175.405 a) 1) A) Spill containment equipment that will prevent release of product to
the environment when the transfer hose is detached from the fill
pipe (e.g., a spill catch basin). Spill containment equipment shall
be maintained in a dry, clean state. |