| Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation and must be completed within 30 days. |
| 1, 3, 4, 5, 7 |
Annual leak detection certification not completed (Required annually). |
| Facility |
Facility Operation and Maintenance Plan not completed or available. |
| 1, 4, 5, 7 |
Flex connector sacrificial anode system not tested (required every 3 years) - Test anodes and replace as needed |
| 1, 3, 4, 5, 7 |
Mechanical line leak detector requires annual functional test. |
| Facility |
Missing copies of Annual Walkthrough Inspection Report. |
| Facility |
Missing list of designated Class A/B & C Operators |
| 1, 3, 4, 5, 7 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
| Facility |
Submit Notification Form for Facility Information Change - Facility Name |