1 |
Annual leak detection certification not completed (Required annually). |
1 |
Dispensers - the following hoses or breakaways are missing or actively leaking and require immediate replacement (bagged at inspection) - Leaking at the nozzle |
2, 3 |
Dispensers - the following hoses or breakaways are missing or actively leaking and require immediate replacement (bagged at inspection) - Hose separated at breakaway |
2, 3 |
Miscellaneous - Petroleum and hazardous substances shall be transferred from tanks by
means of fixed pumps designed and equipped to allow control of the flow and to
prevent leakage. 175.450.a |
1, 2, 3 |
Precision tank test required. - Precision tank test is required on tank(s) if you cannot provide 24 months’ worth of tank “PASS” from ATG. |
1, 2, 3 |
Required monthly tank leak test records not available. - No CSLD records available |
1, 2, 6 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
6 |
Tank interstitial sensor functional test not accomplished (Required annually). |